Solar farm thermal scan
2,000 panels scanned in one morning; 14 hot spots located for the maintenance crew.

A quick look at the job behind the deliverable.
Output down 6% and no way to find the faulty panels
One thermal flight over the full array, each anomaly located by row and panel
14 hot spots and 2 failed strings fixed in a week







One morning in the air, a week to full output.
The maintenance crew went straight to the 14 flagged panels and the two dead strings. The array was back to expected output within a week, and we scan it again every spring and fall.
2-day delivery
Flight on Tuesday, thermal map and report on Thursday.
14 hot spots found
Plus two failed strings, each located by row and panel.
0 h of downtime
The array stayed in production during the scan.
Scans twice a year
Spring and fall flights to catch new faults early.
We got a map of exactly which panels to fix, two days after the flight. The walk-through would have taken a week.
Jean-François B.
O&M Manager · Montérégie